Place the prefabricated tank plates on the splicing machine, align and press them, and then use the welding machine for automatic welding.
Step 2 : Rolling plates:
The spliced tank plates are automatically transferred to the barrel rolling equipment for tank shape forming.
Step 3 : Docking cylinder:
Docking the rolled cylinder, and install components such as the head, wave-breaking plate and bulkhead plate.
Step 4 : Cutting manhole cover:
Cut the installation position of the manhole cover on the top of the tank to facilitate the subsequent installation of the manhole cover and internal operation.
Step 5 : Welding bulkheads and wave-breaking plates:
Welding bulkheads and wave-breaking plates.
Step 6 : Automatic rotation welding:
Use the tank circumferential seam automatic welding machine to rotate the tank and automatically weld the joint between the head and the cylinder to enhance the firmness of the tank.
Step 7 : Installing manhole cover:
Install the manhole cover to the reserved position.
Step 8 : Installing the base frame:
Install the welded tank base frame in place.
Step 9 : Installing the subsea valve and unloading pipeline:
Install the subsea valve and unloading pipeline.
Step 10 : Install lower plate assembly:
Install mudguards, rear ladder, side guards, tool box, unloading box and other components.
Step 11 : Factory inspection and vehicle finishing work:
Pressure test the tank body and conduct a water flushing test; complete finishing work such as painting, installing tires and circuit systems.